Concrete Calculator

Pouring a slab, a footing or fence post bases? Enter the length, width and depth to find out how many cubic yards of concrete you need — and how many bags that means.

4 inches is typical for a patio or walkway slab; driveways usually need 5–6 inches.

Concrete You Need

Save to Pinterest
Disclaimer: Results are estimates only. Bag yields are approximate — 60-lb bags yield about 0.45 cu ft and 80-lb bags about 0.6 cu ft — so check the yield printed on your bag. Order a little extra; running short mid-pour is far worse than having a bag left over.

How It Works

Concrete is ordered by volume, and the maths is length × width × depth. The calculator converts the depth from inches to feet, multiplies the three dimensions to get cubic feet, then divides by 27 — the number of cubic feet in a cubic yard — because ready-mix concrete is sold by the cubic yard. For bagged concrete it divides the cubic feet by the yield of each bag size and rounds up, since you cannot buy part of a bag.

The bag yields used here are the standard approximate figures: a 60-lb bag yields about 0.45 cubic feet and an 80-lb bag about 0.6 cubic feet. Yields vary slightly by brand, so check the yield printed on the bag you buy.

Worked Example

A 10 ft × 10 ft slab, 4 inches deep: the area is 100 sq ft and the depth is 4 ÷ 12 = 0.333 ft, so the volume is 100 × 0.333 = 33.33 cubic feet. That is 33.33 ÷ 27 = 1.23 cubic yards. In bags: 33.33 ÷ 0.45 = 74.07, so 75 sixty-pound bags; or 33.33 ÷ 0.6 = 55.56, so 56 eighty-pound bags.

Assumptions

Concrete for a 10 ft × 10 ft slab at different depths:

Slab depthCubic feetCubic yards60-lb bags80-lb bags
3 inches25.000.935642
4 inches33.331.237556
6 inches50.001.8511284

How to Use This Calculator

Enter the length and width in feet and the depth in inches. Results update live, showing cubic feet, cubic yards and bag counts. For an irregular shape, split it into rectangles, run each one separately, and add the volumes.

Tips and Practical Advice

For anything over about a cubic yard, ready-mix delivered by truck is usually cheaper and far easier than mixing dozens of bags by hand. Add a small buffer — ground is rarely perfectly level, and a slab that comes up short mid-pour leaves a weak cold joint. And check the depth with a tape measure inside the forms before the concrete arrives.